All Projects
Coal Preparation Plant
Management Services
Materials Handling
- Curragh Washery CPP Construction & Commissioning
- Ravensworth Coal Terminal Rail Loader Conversion
- Hebburn Modular Washery & Materials Handling (Proj Mgr)
- SBCL Kenmare Overland Conveyor
- Hail Ck Mine Rejects Screen Throughput Upgrade
- Special Projects
- PCI Coal Blending Feed System
- Beltana Mine Infrastructure
- Boggabri Crushing & Loadout System
- BHP Saraji 60m Radial Stacker
- BHP Mt Owen High Flow Rejects Bin
- Bayswater Colliery Bulk Coal Handling High Discharge Rate Bins
- Bloomfield Stackout Conveyor Transfer System
- Bulga Mine ROM Coal Handling System Major Upgrade
- Bulga Raw Coal ROM Dump Hopper Upgrade
- Bulga High Flow Rejects System Upgrade
- Cumnock Raw ROM Coal Receival and Stackout
- Cumnock Product Coal Loadout System
- Bayswater Colliery Fine Coal Washery Upgrade
- Nardell Drift Conveyor and Stackout System
- Bulga Washery CPP Upgrade
- Other Projects
Next Previous Testimonials
"What rejects bin? That thing is out of sight and out of mind. Never gives us any problems and always works as expected. JUST THE WAY WE LIKE IT."Coal Prep Plant Manager, Hunter Valley
"In twenty years the radial stacker you guys put there has given no trouble at all - except we are wearing out the (free issued) long travel wheels a lot, do you know how to stop that?" (We did; advised the right grade of wheel to buy)Maintenance Planner, Bowen Basin
"The rapid retrieval of the situation with the wrecked rail loader from when the loco hit it remains a career stand-out for me; never seen anything handled that well before, or since."Chief Engineer, Hunter Valley Mine
"I have seen a lot of FEL crusher setups in ROM coal, but never one as well laid out and functional as the unit you guys put up at Boggabri. Easy to maintain and live with operationally; a real gem."Nearby Mine Manager, Gunnedah Basin
"You guys did such a good job of that blending system for us, we really wish we could get you to take over all the other upgrade projects we have different contractors doing on the site."Chief Engineer, Pt Kembla
"The trend graph from the last 4 days of that new two mass rejects screen is showing a fantastic result, with very steady accelerometer values and good tonnage."Maintenance Manager, Bowen Basin
"We couldn't have got that mine viable if it weren't for the fantastic work you guys did to find economical solutions to our handling problems in the early stages. Thank you for this."Coal Group Manager
"Wow, one man operation of the whole crushing and auto-loading B-Double truck system that really works; it does what it is supposed to, has some great self-recovery features, and doesn't spill a drop - who comes up with that stuff!"Principal Engineer, Hunter Valley
Please note most mining companies have a policy not to give formal references to any entity. Actual references given above are 100% truthful, but anonymised to respect and comply.