Rejects handling and auto truck loading facility
for BULGA COAL, Xstrata (Design and Construct Project)
Design construct project for the supply and installation of a new fully automated rejects conveyor and high rate discharge, expanded mass flow bin system and all associated civils, electricals and control.
Key Benefits
- 14 week design, construct and commission.
- Innovative technical solution and operational features.
- Constructed with no disruption to existing operations.
- Optimised expanded mass flow for maximum capacity with best bin wall / wear liner life.
- Automated Euclid truck optimised 44,000 tph fast filling system.
- 1.9m square, fast acting double blade gate design loads dump trucks to full rated capacity.
- Extremely reliable operation.
- Compact functional economical system. The mine loves it!