Rejects Module Discharge End Arrgt Vacuum Jig Thickener Deaeration and Floc Tanks Clarified Water Tank and Thickener Thickener Sumps Storage Sump Construction Rejects conveyor and bin Rejects bin Products conveyor and loadout bin Phil inspects product conveyor construction Phil inspects Pressure Jigs installation "It's All Good" Power supply genset lifted into place Merrywood Tasmania Equipment Jigs air supply fan Instrument air supply In-Feed Conveyor Fines Cyclones Feed Screen Operation Feed Screen Construction Feed Dam Operational Mine Feed Area Dump Hopper and reclaim conveyor Crushing Station Feed Centrifuge Station Centrifuge Bucket Elevators

Project Manage CPP Washery Construction to re-work old mine tailings

for HUNTER ENVIRO MINING (Project Manager)

Project manager for the identification, acquisition, configuration, installation and commissioning of a modular coal system and all associated civils, electricals and control.

Key Benefits

  • Significant use of second hand plant to reduce overall construction costs.
  • Greatly improved on the original concept to ensure the process was viable.
  • Project was exposed to significant threats of failure that were successfully managed.
  • Highly commended by the overall project’s owners.