High Flow 600t Rejects Bin
for Thiess – BHP Mt Owen Mine. (Design and Construction Project)
Design construct project for the supply and installation of a new rejects bin system and associated civils.
Key Benefits
- Optimised mass flow of sticky high clay rejects material
- Automated Euclid truck optimised 44,000 tph fast filling system
- 1.9m square, fast acting double blade gate design loads dump trucks to full rated capacity
- Extremely reliable operation
- Highly structurally efficient design for economic functional construction
Project Summary sheet
(Click image for .pdf Summary sheet)