High Flow 600t Rejects Bin

for Thiess – BHP Mt Owen Mine. (Design and Construction Project)

Design construct project for the supply and installation of a new rejects bin system and associated civils.

Key Benefits

  • Optimised mass flow of sticky high clay rejects material
  • Automated Euclid truck optimised 44,000 tph fast filling system
  • 1.9m square, fast acting double blade gate design loads dump trucks to full rated capacity
  • Extremely reliable operation
  • Highly structurally efficient design for economic functional construction