Assembly - Trestle preparation Stacker Operational, Jetslinger in active position Australian Mining Review Article Drive Arrgt, relocated to be accessible (was at head end of old stacker) Jetslinger, Discharge end Direct load-out (bypass) mode Dual walkway, left side Trestle Leg Erection Construction Tail End (on rotating access platform) Lower Receiving Chute, right side Feed point, right side Upper Feed Receiving Chute Main Feed Chute Belt Tracker Main Control Centre panel front Main Control Centre, overall Jetslinger Mtce Electric Hoist Jetslinger position drive Jetslinger Side Access Mtce Platforms Jetslinger - discharge end view Jetslinger Mtce Access Jetslinger Local Control Station Walkway Crossover & Wind Guards Stacker AutoLube System VSL Bars, upper termination point Take-up Counterweight Moving Access & Counterweight guard Maintainable Pivot Bearing assembly (previous one failed and stacker collapsed) Direct load-out (bypass) Chute Direct load-out (bypass) chute in position Direct load-out (bypass) mode - tail view
for BHP COAL SARAJI MINE (Design and Construct Project)
Design construct project for the supply and installation of a new 1,500t/hr radial stacker system and associated civils to urgently replace previous catastrophically failed stacker.
Key Benefits
15 week design, construct and commission
Innovative maintenance minimisation and mgt features
Optimised mechanical and structural design
Easy maintenance of rear pivot assembly designed in
You must be logged in to post a comment.